How Casares del Sol pm4 has developed over the years

2023

Enhancements abound at Casares del Sol PM4! Upgrades included new wrought iron balustrades replaced wood to first floor apartments, 10 small path lights replaced, and festive Christmas lights. πŸ’‘πŸŽ„πŸŒŸ

2022

Enhancing safety at Casares del Sol PM4: Installed CCTV cameras in 2022 for security, and added fire extinguishers to portals. πŸ”’πŸ”₯

2020/ 2021

During 2020/2021, Casares del Sol PM4 was maintained, focusing on garden & building care during these 2 Covid years.

2019

Casares del Sol PM4 underwent a 6-month painting project across all 5 blocks. Essential drain work was done, with the necessary garden restoration. πŸ—οΈ

2018

Enhancements in 2018: Key fob system installation at gates & revitalized slopes with feature palms at Casares del Sol. πŸŒ΄πŸ”‘

2017

Enhancements in 2017: Refreshed shower screens, more garden benches, and expanded planting areas at Casares del Sol PM4. πŸŒΏπŸŠβ€β™‚οΈ

2016

Enhancements in 2016: New path created, garden planting, motion sensors in the garages and work on the drains. Costa del Sol faced worst floods in 30-years.πŸŒ„

2015

Enhanced in 2015: Gardens upgraded, terrace extensions added, and new pathways in Casares del Sol PM4. 🌿

2014

Revamp 2014: Casares del Sol pm4 transformed with a 6-month, 5-block paint project. Upgraded internet & TV reception in all apartments. πŸ–ŒοΈπŸŒπŸ“Ί

2013

Major remodel to Casares del Sol PM4 swimming pool with gradual steps to give accessibility to all. Refreshing and accessible perfection! πŸŠβ€β™‚οΈπŸοΈ

2012

Enhancements in 2012: Rain channeling, new entrance wall, remodeled garage entrance with landscaping, and a new putting green at Casares del Sol PM4. πŸŒ§οΈπŸ—οΈπŸžοΈ

2011

Stay connected at Casares del Sol PM4 with our first communal WiFi in 2011! Enjoy lush landscaping with citrus trees between blocks 28 and 29, and expanded children’s pool area. πŸŠβ€β™‚οΈπŸŒΈ

2010

Transforming Casares del Sol PM4: Planted trees for privacy, added climbers to perimeter fence, and a boule court added in 2010. 🌿🏞️

2009

Casares del Sol pm4’s transformation in 2009: every owner paid an extra 1150 euros to the community in two instalments. Enhanced security with perimeter fencing, pedestrian gates, fob entry. And a new owner-president was elected. πŸ”’βœ¨

2008

The start of landscaping the portals, planting tropical plants and finishing with white stones. A project that was to take several years to complete. And new garden beds were created to disguise the manholes in the gardens.

2006 / 2007

2007: First owner president elected. Now the work started to fulfill the promised dream of tropical gardens. Garages flooded because of blocked drains caused by builders rubble.

2006: First owners moved into their apartments. The reality didn’t quite match up to the promise of the brochure!

The Off-Plan Brochure

Contruction of pm4 (2003-2006)